Commercial fit-out, Toronto

Commercial · Toronto & GTA

We build the spaces your business runs on.

Clinics, retail plazas, offices and restaurants. One accountable team from pre-construction to handover, with the millwork shop behind some of Toronto's most photographed interiors.

Built with precision. Delivered on schedule.

Our commercial work began with retail plazas and medical clinics across the GTA. Today the same licensed carpenters, electricians and plumbers that build our residential projects deliver commercial fit-outs, backed by a custom millwork partner and a project manager who answers to you. We plan every job backwards from your opening date.

Services

One team. One contract. One accountable process.

General Contracting

Full scope under one fixed-price contract: trades, scheduling, permits, inspections and close-out.

Design-Build

Design, budget and construction decided together, early, so there are no surprises once walls open.

Pre-Construction Planning

Site review, landlord requirements, code and permit path, and a realistic schedule before you commit.

Millwork & Fixtures

Reception desks, display units, cabinetry and feature walls through our exclusive millwork partner.

Tenant Improvements

Demising walls, base-building tie-ins, landlord work letters and phased work while you stay open.

Exterior & Site Work

Stucco and façade repair, parking lot asphalt, bollards, wheel stops, railings, concrete and interlock.

Selected commercial work

Plazas, clinics and site work across the GTA

  • Medical clinic fit-out, Greater Toronto Area
  • Retail plaza safety and exterior upgrades, Scarborough
  • Plaza parking and site work, Brampton
  • Storefront protection and bollards, Scarborough
All projects
Commercial work

How commercial jobs run

Planned backwards from your opening date

  1. 01

    Site review

    Walk the space, read the landlord package, flag code and permit issues before pricing.

  2. 02

    Fixed-price proposal

    Itemized, with a dated schedule and the trades listed. No open-ended allowances.

  3. 03

    Permits

    Building, ESA electrical, plumbing and health permits handled, landlord kept in the loop.

  4. 04

    Build around you

    Nights, weekends and phased work so you can stay open where possible. Daily supervision.

  5. 05

    Close-out

    Final inspections, deficiencies cleared, as-builts and warranties handed over.

How long does a commercial fit-out take?

Most retail and office fit-outs in Toronto run 3 to 10 weeks on site. Restaurants and clinics with new mechanical and plumbing sit at the longer end. You get a dated schedule with the proposal.

Do we need a building permit?

Almost always for commercial work: any change to layout, plumbing, electrical, ventilation or exits needs a City permit, and restaurants and clinics add health approvals. We prepare and file the applications.

Are you insured for commercial sites?

Yes. WSIB clearance and $5M general liability on every job, with certificates provided to the landlord or property manager before we start.

Start a commercial project

Send the plans or a few photos. We visit the site within days and price it in writing.

Prefer to talk?

(647) 770-5152

[email protected]
Vaughan, Ontario, Canada

  • WSIB compliant
  • $5M liability insured
  • Fixed-price contracts
  • Licensed in-house trades

Ready to start your renovation?

Free on-site consultation and a written fixed-price quote within 5 business days.

5.0 · 10 Google reviews