Structural work is where a renovation either gains real space or goes badly wrong. From a home addition in Toronto to a single new beam, Country Renovations plans and builds the structural side of the job: second-storey and rear additions, open-concept conversions that remove load-bearing walls, basement underpinning for full-height ceilings, and the steel and LVL beam work that holds it all up. Every job is engineered, permitted with the City, and built by our crews and licensed, WSIB-covered trade partners.
What we do
- Second-storey additions: add a full floor to a bungalow or one-and-a-half storey home without moving. Typical Toronto range is $150,000 to $350,000 depending on footprint and finishes.
- Rear and side extensions: extend the kitchen and family room into the yard, with foundations, framing, roofing and tie-in to the existing house.
- Load-bearing wall removal: open-concept main floors with properly sized steel or LVL beams, posts and footings. Engineered drawings included.
- Basement underpinning and bench footings: lower the basement floor for legal ceiling height, done in sequenced sections with engineering sign-off.
- Laneway and garden suites: a separate building in the back yard under Toronto's laneway and garden suite by-laws.
- Foundation repair and waterproofing: crack injection, exterior membranes, weeping tile and sump systems.
How a structural project runs
- Site visit and feasibility. We look at the existing structure, zoning and setbacks and tell you honestly what is possible before you spend on drawings.
- Engineering and permits. Our engineer produces stamped drawings. We file the building permit with the City of Toronto or your municipality and handle inspections.
- Fixed-price quote. Itemized and written, with the structural scope, temporary shoring and finishing clearly separated.
- Build. Shoring goes in before anything comes out. Daily site inspections, weekly updates, and a clean site throughout.
Home addition in Toronto: cost and timeline
Additions typically cost $250 to $650 per square foot fully built, depending on foundations, the size of the openings into the existing house and the finish level. Plan on two stages:
- Design and permits, usually 2 to 4 months. Drawings, engineering and the building permit. If the design does not meet the zoning by-law (height, setbacks, lot coverage), a minor variance from the Committee of Adjustment adds several months. A preliminary zoning review from the City tells you early.
- Construction, usually 3 to 6 months for a rear addition or a second storey, from excavation or roof removal to final inspection.
Frequently asked questions
Can we live in the house during an addition?
For a rear addition, usually yes; the opening into the house is made near the end. For a second storey the roof comes off, so most families move out for part of the build.
Does the foundation need reinforcing for a second storey?
Sometimes. The engineer checks the existing footings and foundation walls, and if they cannot carry the new load, underpinning or new footings become part of the design.
Do I need an architect?
For most additions, a qualified designer or architect prepares the drawings and a structural engineer stamps the structure. We coordinate both, so you deal with one team.