Everything you see in a finished renovation sits on the framing. If a wall is out of plumb, a floor has a dip or a header is undersized, the drywall cracks, the tile lifts and the doors never close properly. As a framing contractor in Toronto, Country Renovations frames every project with experienced carpenters, to engineered drawings where required and to the Ontario Building Code everywhere else.
What we frame
- Additions and extensions: floor systems, exterior walls, roof framing and sheathing for second storeys and rear additions.
- Load-bearing changes: temporary shoring, new headers, LVL and steel beam installation, posts and point loads carried down to footings.
- Basements: insulated exterior wall framing, partition walls, bulkheads around ductwork, and egress window openings.
- Interior layout changes: new rooms, closets, openings and door relocations, with blocking for cabinets, grab bars and wall-mounted fixtures.
- Floor repairs: sistering sagging joists, levelling, and new subfloor glued and screwed to stop squeaks.
How we do it
We check the existing structure before we price, so there are no surprises when walls open. Framing is inspected by the City where a permit applies, and we do not close a wall until the electrical, plumbing and HVAC rough-ins inside it have passed. It costs a day of patience and saves months of callbacks.
Hiring a framing contractor in Toronto: what to check
For most houses, framing is covered by Part 9 of the Ontario Building Code: stud spacing, header and joist spans, fire blocking, and how loads reach the foundation. Anything beyond the span tables, such as a removed bearing wall or a new opening in an exterior wall, needs a design from a structural engineer. Before you hire anyone, ask three things:
- Who designs the beams? Steel and LVL beams should be sized by an engineer and shown on stamped drawings, not chosen on site.
- Who pulls the permit? Structural framing, additions and new openings need a City of Toronto building permit, and the framing inspection happens before insulation.
- Is the crew covered? Ask for proof of WSIB coverage and liability insurance. If an uninsured worker is hurt on your property, the claim can land on you.
What affects the price of framing
Framing is priced by scope, not by the hour. The main factors:
- How much of the existing structure has to be opened, shored or removed first.
- Engineered materials: LVL beams, steel posts and new footings cost more than dimensional lumber.
- Access: a second storey that needs a crane lift, or a basement with a narrow stair, takes more labour.
- Old houses: in pre-war Toronto homes we often find undersized joists, notched beams or past alterations that have to be corrected before new work goes on top.
Every quote is fixed-price and itemized, and framing is priced together with the rest of the renovation, so there is no gap between trades.
Frequently asked questions
Do I need a permit to frame a basement?
Often, yes. A permit is needed when you add a bedroom, a bathroom or a new unit, or change structure, plumbing or ductwork. We confirm it with the City before work starts.
Can you remove a load-bearing wall in a Toronto house?
Usually. The load moves to a new beam, posts and footings designed by an engineer and inspected by the City. See structural changes for how that project runs.
How long does framing take?
Partition walls for a basement take a few days. Framing a second-storey addition, including floor, walls and roof, typically takes two to four weeks before roofing and windows.